Project Description

3.2 Certification as per EN 10204
for the steel components of 120 pot bearings
R999/1 DUBAI WATER CANAL, Infrastructure Package 1
Elevating Sheikh Zayed Road, Dubai, United Arab Emirates

Client: MAGEBA
Thir Party Certification: Penelis Consulting Engineers S.A.

3.2 certification, as per EN10204, for the steel components of all pot bearings manufactured by Mageba S.A. for the project “R999/1 DUBAI WATER CANAL, Infrastructure Package 1 Elevating Sheikh Zayed Road, Dubai, United Arab Emirates”.

The project includes 120 RESTON-Pot bearings as per AASHTO for Roads & Transport Authority Dubai, based on the use of weathering steel ASTM A588 (or equivalent S355J0W).

Penelis Consulting Engineers was employed by MAGEBA and Approved by the Dubai Transport Authority as the third party to provide the 3.2 certification for the project.

Project gallery