Ikos Resort – Athos Palace & Pallini Beach towers (Kallithea, Halkidiki)
Vibration-free demolition works. Project article
Pallini Beach – balcony demolition (September 2026)
Pallini Beach – balcony demolition (September 2026)
Athos Palace – vibration-free cutting (June 2026)
SNF Hospitals – timber façade fire test
Full-scale fire resistance test of the timber façade (EI 60). News article
The fire test in progress
The test specimen being removed from the furnace
Oman Cultural Complex (Muscat, Oman)
Construction progress. Project article
Site progress (July 2025)
Restoration of Theatres Pallas-Aliki (Athens Greece)
Contractor: GEK-ΤΕRΝΑ
Demolition
Upgrading 1/4
Upgrading 2/4
Upgrading 3/4
Upgrading 4/4
National Museum of Contemporary Art (Athens, Greece)
Contractor: AKTOR
Demolition of beam @ Syggrou & Frantzi (8t)
Demolition of beam @ Syggrou (10t)
Demolition of beam @ Kalirois & metro
Demolition of column @ Syggrou & Frantzi (9t)
Restoration of St.George Church & Roman Tower οf 3rd CE. AC
Contractor: The Arab Contractors
Exterior of Church of St. George
Interior of Church of St. George
Roman Tower Entrance
Interior of roman tower (3rd CE AC)
Interior of roman tower (3rd CE AC)